GRP Lining in Sludge Tank with Crack Injection Repair, Almarai Abu Dhabi

Project Overview

Client: Almarai Drinks Manufacturing LLC
Location: Kizad, Abu Dhabi
Contact Person: Farhan Siddique (Civil Engineer)
Start Date: 05 January 2023
End Date: 21 January 2023
Area: 85 m2 (Walls and Floor of Sludge Tank)

The goal was to replace damaged GRP lining in a sludge tank and repair cracks using crack injection treatment.

Findings

  • GRP delaminated; prominent stains and cracks were observed.
  • Required chemical resistance due to industrial sludge content.

Risks

  • 5-meter-high tank with confined space and chemical exposure risks.

Solution

  • Damaged GRP was removed.
  • Cracks were injected with epoxy material.
  • New vinyl ester GRP applied with proper sanding and gel coating.
  • Project validated by leak testing.

More Projects Like This

Ready to Talk?

Do you need waterproofing support for a similar issue? Contact us for a free inspection within 24 hours.

GRP Lining in Sludge Tank with Crack Injection Repair, Almarai Abu Dhabi