GRP Replacement in Basement Water Tanks, Dubai

Project Overview

Client: Dubai Marriott Harbour Hotel & Suites
Location: Dubai Marina
Contact Person: Inderjit (Engineer)
Start Date: 23 January 2023
End Date: 04 February 2023
Area: Two UG Water Tanks, 575 m2

This project focused on replacing delaminated GRP lining in two 575 m² basement water tanks. The new system is installed after the proper removal of the existing damaged waterproofing.

Findings

  • The surface had pinholes, stains, and hollow sounds indicating detachment.
  • GRP had to be removed and replaced entirely.

Risks

  • Confined space, chemical hazards, and height (6 meters) posed safety concerns.

Solution

  • Old GRP completely removed and new lamination applied.
  • ISO-grade gel coat is used for long-lasting performance.
  • Materials were WRAS-approved and safe for potable water.

More Projects Like This

Ready to Talk?

Do you need waterproofing support for a similar issue? Contact us for a free inspection within 24 hours.

GRP Replacement in Basement Water Tanks, Dubai