Project Overview
Client: Sharjah Police
Location: Industrial Area 10 Police Station Sub Jail
Contact Person: Mr. Ameer & Mr. Saeed (Engineer)
Start Date: 27 May 2023
End Date: 07 June 2023
Area: 80 m2 (10 Toilets – 1st Floor)
The toilet had an existing bitumen membrane that had failed, leading to leaks into the ground floor, damaging the ceiling and furniture.
Findings
- Residual bitumen patches remained after removal, potentially affecting GRP bonding.
Solution
- Fully removed all bitumen traces.
- Applied GRP lining system with white gel coat.
- 3-day water test confirmed successful sealing.